Construction work on House 7 has begun
Construction of the seventh residential building No. 7 is in full swing and is scheduled for completion by March 2025.
The building will have 11 floors. The apartments will be delivered in a fully “white-frame” condition. The minimum apartment size starts at 41 sq. m.